Issues Matrix – Exercise For Managing Complex Issues/Problems

DESCRIPTION:
A matrix is a simple format that is useful for analyzing many issues. A common DesignTeam assignment is for participants to build a matrix model of the situation under consideration. To build a matrix, you define two parameters (typically as an x and y axis) and assess what you get at each intersection. This is usually a fast-track assignment (given to one team while others work different issues); rarely, as a co-process assignment (the same assignment given to all teams). Examples: 1. Types of Work: one axis ranges from mass-produced to custom-built; the second axis, from high-tech to low-tech (with defined gradations in between). Assess the potential for each combination of choices. 2. Corporate structure: one axis is the hierarchy, from CEO to line worker; the other axis, the kinds of decisions to be made, from strategic to task. Analyze at each intersection the nature of the activity; for example, decide, recommend, advise/consult, implement, inform. 3. Product development: one axis is mass-produced to custom-built; the second, annual family income of potential customers. Assess the company’s highest potential product in each category.

MISSION:
To clarify through analysis of a situation; to build a model that forces systematic thinking across a range of choices.

TIMING/TIME REQUIREMENTS:
This can be used in Scan; more often is used as a Focus assignment. Requires a typical DesignTeam round.

DESIGN CONSIDERATIONS:
Strengths — Requires participants to think systematically. Weaknesses — Highly specific — participants may feel it’s overly restrictive. Specifications for Success — 1. If you assign participants to build a matrix, be sure the assignment is challenging enough and hold them to it. If you have doubts, give them a more general (and challenging) assignment, and let the matrix format be a suggestion rather than a requirement of their assignment.

VARIATIONS:
Often, teams are given a general assignment to build a model; then the facilitators may choose to suggest the issues matrix format as appropriate when they are working in their teams. This is a less restrictive approach.

More from the blog

Innovators are not one instruction.
AI enablement and adoption · Apr 30, 2026
How to Innovate Your Companies Town Hall / All Hands TRY 2
What's a focus group anyways?
The innovation function · Apr 23, 2026
Innovation Workshops/Focus Groups Don’t Work Anymore
AI and your job as a compression
AI enablement and adoption · Apr 20, 2026
From Farm to Factory to… Pontifications from a Dave Gray article

Connect your mission to the breakthrough it needs

Innovation work rarely fails for lack of ideas. It fails when what the program knows is spread across systems that don’t share a record. Bring the program, and we’ll show you where it could run on one.

Contracting vehicles

Direct award pathways, no new competition required.

SBIR Phase III

Under 15 U.S.C. § 638(r)(4), a Phase III award derived from Collaboration.Ai’s prior SBIR work may be made without further competition.

DAF DTO BOA

Order through the DAF Digital Transformation Office Basic Ordering Agreement.

Not sure?

We’ll walk through which pathway fits the program. Contact us →